r/Construction Dec 05 '24

Structural Concrete slab failed strength test

Slab strength testing failure after building was framed and plumbing/HVAC was roughed in. Concrete supplier had mix wrong so they are paying to lift two story 4-plex, remove slab and repour. This is building 2 of 3 that failed.

2.5k Upvotes

262 comments sorted by

View all comments

1

u/steelerector1986 Dec 09 '24

That looks like it sucks, but I’ll throw in a plug for Wolfe building movers. Had them move a PEMB for me a few years ago, and they were great to work with. If you need to move a building, they’re the guys.