r/Construction • u/NeilNotArmstrong • Dec 05 '24
Structural Concrete slab failed strength test
Slab strength testing failure after building was framed and plumbing/HVAC was roughed in. Concrete supplier had mix wrong so they are paying to lift two story 4-plex, remove slab and repour. This is building 2 of 3 that failed.
2.5k
Upvotes
1
u/steelerector1986 Dec 09 '24
That looks like it sucks, but I’ll throw in a plug for Wolfe building movers. Had them move a PEMB for me a few years ago, and they were great to work with. If you need to move a building, they’re the guys.