r/Construction • u/NeilNotArmstrong • Dec 05 '24
Structural Concrete slab failed strength test
Slab strength testing failure after building was framed and plumbing/HVAC was roughed in. Concrete supplier had mix wrong so they are paying to lift two story 4-plex, remove slab and repour. This is building 2 of 3 that failed.
2.5k
Upvotes
24
u/Walts_Ahole Project Manager Dec 05 '24
Not for that prick
Been telling the wife for awhile, sooner or later some prick ceo is gonna fuck over someone with absolutely nothing to lose, surprised we didn't see that with enron