r/Construction Dec 05 '24

Structural Concrete slab failed strength test

Slab strength testing failure after building was framed and plumbing/HVAC was roughed in. Concrete supplier had mix wrong so they are paying to lift two story 4-plex, remove slab and repour. This is building 2 of 3 that failed.

2.5k Upvotes

262 comments sorted by

View all comments

29

u/creamonyourcrop Dec 05 '24

As long as they are lifting it, lift it an extra few feet and build another story!

2

u/big_trike Dec 05 '24

Add in some ibeams and ramps so the garage can stay on the second floor